Market City Retail

The project involved the demolition of an existing Cinema tenancy fit out inside the Market City Shopping Complex.


Works involved several stages which included modifying the existing services area to allow for temporary access to the main demolition works. The existing cinemas demolition comprised of the dismantling and removal of screens, projectors, cinema services and cinema seating. 


Specialist equipment was used to carry out the demolition and careful dismantling of heavy structural steel and reinforced concrete which formed the structural tiered seating arrangement.


Works required strong planning and scheduling, which minimised centre and neighbouring residential disruption. Day shifts involved heavy demolition and vibration works and night shifts involved the removal of light debris. All debris and demolished material was recycled.


Structus completed this project ahead of schedule which allowed the incoming tenant to commence without delay.

© 2019 STRUCTUS. All Rights Reserved.